Surface preparation :It should be sanded, repaired, dust collected according to the site basic condition; Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles, oil, grease, and other contaminants.Application StepEnsure that you take precautionary measures before starting this project. Work in a well-ventilated area, and wear gloves, masks and safety goggles to avoid skin, respiratory and eye irritation.
Primer
Marble Texture Top Coating
Varnish (optional)
Property
Solvent free ( Water based )
Solvent free ( Water based )
Solvent free ( Water based )
Dry film thickness
50μm-80μm/layer
1mm-2mm/layer
50μm-80μm/layer
Theoretical coverage
0.15 kg/㎡
1.2 kg/㎡
0.12 kg/㎡
Touch dry
<2h(25℃)
<6h(25℃)
<2h(25℃)
Drying time (hard)
24hours
24hours
24hours
Volume solids %
60
80
65
Application restrictionsMin. Temp. Max. RH%
(-10) ~ (80)
(-10) ~ (80)
(-10) ~ (80)
State in the container
After stirring, there is no caking, showing a uniform state
After stirring, there is no caking, showing a uniform state
After stirring, there is no caking, showing a uniform state
Constructability
No difficulty in spraying
No difficulty in spraying
No difficulty in spraying
Nozzle orifice (mm)
1.5-2.0
5-5.5
1.5-2.0
Nozzle pressure(Mpa)
0.2-0.5
0.5-0.8
0.1-0.2
Water resistance(96h)
Normal
Normal
Normal
Acid resistance (48h)
Normal
Normal
Normal
Alkali resistance(48h)
Normal
Normal
Normal
Yellowing resistance (168h)
≤3.0
≤3.0
≤3.0
Wash resistance
3000 times
3000 times
3000 times
Tarnish resistance /%
≤15
≤15
≤15
Mixing ratio for water
5%-10%
5%-10%
5%-10%
Service life
>15 years
>15 years
>15 years
Storage time
1 year
1 year
1 year
Coatings colors
Multi-color
Multi-color
Transparent
Application way
Roller or Spray
Roller or Spray
Roller or Spray
Storage
5-30℃, cool, dry
5-30℃, cool, dry
5-30℃, cool, dry
Filler (optional)Pre-treated substratePrimerVarnish (optional)Marble texture top coating
Application
Suitable for commercial building, civil building, office, hotel, school, hospital , apartments, villa and other exterior and interior walls surface decoration and the protection.
Package
20kg/barrel.
Storage
This product stored at above 0 ℃, well ventilation, shady and cool place.
Construction ConditionsThe construction conditions should not be in moisture season with cold weather (temperature is ≥10℃ and humidity is ≤85%). The below application time refers to normal temperature in 25℃.Primer :1) Mix primer in a barrel (After a long time of transport, paint will have the phenomenon of layering, so in the open barrel cover after the need to stir), fully mix and stir in 2-3 mins until without equal bubbles; 2) Rolling primer evenly with long hair roller at 1 time (as the attached picture show).The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. According to the absorption condition of substrate, a second coat may be required; 3) 24 hours later hard dry (in normal temperature 25℃ ); 4) Inspection standard for the primer: even film with certain brightness.Marble texture top coating :1) Mix marble texture top coating in a barrel, fully mix and stir in 2-3 mins until without equal bubbles; 2) Spraying top coating evenly by spray gun at 1 time (as the attached picture show); 3) 24 hours later hard dry (in normal temperature 25℃ ); 4) Inspection standard for the top coat: Non-sticky to hand, no softening, no nail print if you scratch the surface; 5) Uniform colors and without hollowing.After each coat, it is essential to clean up your tools and work area. Remove excess paint with a scraper and clean your brushes and roller with soap and water.It is vital to have a professional with experience handle this project. A professional can ensure safety and timely completion of the project. You must also ensure that you have enough paint to cover all the walls you plan to treat. A shortage of paint can create color variations, leading to an uneven effect.the creation of a marble texture wall paint project requires expertise, patience, and attention to detail. To achieve the best results, ensure that you have the right tools, follow the correct procedures, and take necessary precautions. Consult a professional before starting this project, and make sure to have enough paint to complete the project. Always remember to wear protective gear, work in a well-lit and ventilated area, and clean up your workspace after each coat of paint.