Primer:1) Mix ( A )Primer, ( B ) curinge agent and ( C ) thinner in a barrel according to ratio by weight; 2) Fully mix and stir in 4-5 min until without equal bubbles, ensure paint be fully stirred. The main purpose of this primer is to reach the anti-water, and seal the substrate completely and avoid air-bubbles in the body coating; 3) The reference consumption is 0.15kg/m2. Rolling, brush or spray the primer evenly (as the attached picture show) by 1 time; 4) Wait after 24 hours, the next application step to coat the enamel top coating; 5) After 24 hours, according to the site condition, polishing can be done, this is optionally; 6) Inspection: ensure the paint film is evenly with uniform color, without hollowing.Application Step
Primer
Enamel Top Coating
Varnish(optional)
Property
Solvent
Solvent
Solvent
Dry film thickness
100μm-200μm/layer
150μm-250μm/layer
80μm-120μm/layer
Theoretical coverage
0.15 kg/㎡
0.20 kg/㎡
0.10 kg/㎡
Touch dry
<2h(25℃)
<8h(25℃)
<2h(25℃)
Drying time (hard)
12hours
12hours
12hours
Volume solids %
80
85
80
Application restrictionsMin. Temp. Max. RH%
(-10) ~ (80)
(-10) ~ (80)
(-10) ~ (80)
Flash point
28
38
32
State in the container
After stirring, there is no caking, showing a uniform state
After stirring, there is no caking, showing a uniform state
After stirring, there is no caking, showing a uniform state
Constructability
No difficulty in spraying
No difficulty in spraying
No difficulty in spraying
Nozzle orifice (mm)
1.5-2.0
1.5-2.0
1.5-2.0
Nozzle pressure(Mpa)
0.1-0.2
0.1-0.2
0.1-0.2
Water resistance(96h)
Normal
Normal
Normal
Acid resistance (48h)
Normal
Normal
Normal
Alkali resistance(48h)
Normal
Normal
Normal
Yellowing resistance (168h)
≤3.0
≤3.0
≤3.0
Wash resistance
2000 times
2000 times
2000 times
Tarnish resistance /%
≤15
≤15
≤20
Service life
>10 years
>10 years
>10 years
Storage time
1 year
1 year
1 year
Paint colors
Multi-color
Multi-color
Transparent
Application way
Roller,Brush or Spray
Roller,Brush or Spray
Roller,Brush or Spray
Storage
5-30℃, cool, dry
5-30℃, cool, dry
5-30℃, cool, dry
PrimerPre-treated substrateEnamel Top CoatingVarnish (optional)
Application Scope
Suitable for indoor and outdoor metal surface protection, such as steel structure of pipeline, metal furniture,marine, construction industry, electrical industry, instrument industry etc.
Package
20kg /barrel and 6kg /barrel.
Storage
This product stored at above 0 ℃, well ventilation, shady and cool place.
Construction Conditions The surface should be polished, repaired, dust collected according to the site basic surface condition; Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles, oil, grease, and other contaminants. Enamel Top Coating:1) Mix ( A ) enamel top coating, ( B ) curing agent and ( C ) thinner in a barrel according to ratio by weight; 2) Fully mix and stir in 4-5 min until without equal bubbles, ensure paint be fully stirred; 3) The reference consumption is 0.25kg/m2. Rolling, brush or spray the primer evenly (as the attached picture show) by 1 time; 4) Inspection: ensure the paint film is evenly with uniform color, without hollowing.1) The mixing paint should be used within 20 minutes; 2) Maintain 1 week, can be used when paint is solid absolutely; 3) Film protection: keep away from stepping on, rain, exposing to sunlight and scratching until the film is fully dried and solidified.